SahilOnline | Reflection of the Truth - Leading news portal from Coastal Karnataka

SahilOnline WhatsApp header
collapse
Home / National News / Rescue Efforts Intensify in Uttarkashi Tunnel Operation: Plasma cutter flown in to remove auger blades from rubble
FEATURED NEWS

Rescue Efforts Intensify in Uttarkashi Tunnel Operation: Plasma cutter flown in to remove auger blades from rubble

Sun, 26 Nov 2023 13:15:56  IG Bhatkali   PTI
After Home  on news deatail page after news headline 2

Jharkhand (PTI): Rescue officials during the rescue operation of 41 workers trapped inside Silkyara Tunnel after a portion of the under-construction tunnel collapsed, in Uttarkashi district, Friday, Nov. 24, 2023. The National Disaster Management Authority (NDMA) on Friday said no progress has been made since Thursday in drilling through the debris at the tunnel to rescue 41 trapped workers but assured that the drilling by auger machine will start soon.

uttarkashi-tunnel

Uttarkashi: A plasma cutter was flown in from Hyderabad on Sunday to cut and remove parts of the auger machine stuck in the rubble inside the Silkyara tunnel where 41 labourers have been stranded for the last 14 days.

A complete disengagement of the machine is necessary for the officials to resume the rescue work which involves manual pushing of pipes through rubble to prepare an escape passage.

A part of a drill machine has also been sent atop the hill, above the tunnel, for a vertical drilling.

Also Read:Uttarakhand tunnel collapse: Landline facility set up for trapped workers
A unit of Madras Sappers, an engineer group of the Corps of Engineers of the Indian Army, arrived at the site on Sunday to assist in the rescue operations.

Blades of the auger machine drilling through the rubble of the collapsed Silkyara tunnel had got stuck in the debris Friday night forcing officials to consider switching to other options that could drag the rescue operation by several days, or even weeks.

On day 14 of the multi-agency rescue mission, officials shifted focus to two alternatives -- manual drilling through the remaining 10- or 12-metre stretch of the rubble or, more likely, drilling down 86 metres from above.

The rescue effort began November 12 when a portion of the under-construction tunnel on Uttarakhand's Char Dham route collapsed following a landslide, cutting off the exit for the workers inside.

The workers are in a built-up two-kilometre stretch of the tunnel. They are being sent food, medicines and other essentials through the six-inch wide pipe.